[vc_row][vc_column width=”1/3″][vc_empty_space height=”42px”][vc_single_image image=”134″ img_size=”medium” alignment=”center”][vc_column_text][/vc_column_text][vc_column_text css=”.vc_custom_1663659470843{padding-right: 10px !important;padding-left: 20px !important;}”]Delivery: POA
Pickup: POA[/vc_column_text][vc_column_text]
- Minimum hire: 7days
- Cost per unit, per day
- All Prices Ex-GST and subject to change without notice [contact Traffic Manager of confirmed pricing].
- For long term hire [contact Traffic Manager of confirmed pricing].
[/vc_column_text][/vc_column][vc_column width=”2/3″][vc_empty_space height=”42px”][vc_column_text css=”.vc_custom_1663596052204{padding-right: 10px !important;padding-left: 10px !important;}”]Barrier – Water Filled – Traffic Rated
A traffic rated water filled plastic barrier used for roadworks and traffic management. These waters filled barriers allow an impacting vehicle to be stopped, contained or re-directed in a safe and predictable manner.[/vc_column_text][vc_column_text css=”.vc_custom_1663595989334{padding-right: 10px !important;padding-left: 20px !important;}”]Applications
· Highways / Bridge Roadworks | · Site | · Security |
· Events | · Civil works | · Lane closures |
· Excavation protection | · Pedestrian Protection | · Tunnels and confined spaces |
Main Features
· High Visibility | · Crash Tested – Rated to 50km/hr |
· Interlocking Panel System | · Block out type – plastic |
· Stackable for easy storage & transport | · |
[/vc_column_text][vc_column_text css=”.vc_custom_1663596016768{padding-right: 20px !important;padding-left: 20px !important;}”]Required Transport and Safety Equipment Legends:
You will need to get this item delivered A truck is required
Hirer will need to supply Traffic Control,
Suitable protective clothing is required
[/vc_column_text][vc_column_text][/vc_column_text][vc_column_text css=”.vc_custom_1663596032843{padding-right: 10px !important;padding-left: 10px !important;}”]Relevant Authority and Installation Requirements
Temporary Barriers, will they be selected, installed in accordance with the Manual of Uniform Traffic Control Devices (MUTCD) Part 3: Traffic control for works on roads November 2019 and Supplement:
[/vc_column_text][/vc_column][/vc_row]
Recent Comments