[vc_row][vc_column width=”1/3″][vc_empty_space height=”42px”][vc_single_image image=”110″ img_size=”medium” alignment=”center”][vc_column_text][/vc_column_text][vc_column_text css=”.vc_custom_1663659312055{padding-right: 10px !important;padding-left: 20px !important;}”]Delivery: POA
Pickup: POA[/vc_column_text][vc_column_text]
- Minimum hire: 7days
- Cost per unit, per day
- All Prices Ex-GST and subject to change without notice [contact Traffic Manager of confirmed pricing].
- For long term hire [contact Traffic Manager of confirmed pricing].
[/vc_column_text][/vc_column][vc_column width=”2/3″][vc_empty_space height=”42px”][vc_column_text css=”.vc_custom_1663595715843{padding-right: 20px !important;padding-left: 10px !important;}”]BARRIER – WATER FILLED (PEDESTRIAN)
A water-filled plastic barrier panel used for pedestrian management and safe work zone delineation. Pedestrian barriers help prevent danger between pedestrians and work zones, machinery and other potential hazards.
NOTE: These barriers are not traffic rated or approved.[/vc_column_text][vc_column_text css=”.vc_custom_1663595730862{padding-right: 20px !important;padding-left: 10px !important;}”]APPLICATIONS
· Crowd Management | · Event Management | · Footpaths |
· Pedestrian Management | · Water Hazards |
MAIN FEATURES
· High Visibility | · Interlocking Panel System |
· Block out type – plastic | · Stackable for easy storage & transport |
· Water ballasted |
[/vc_column_text][vc_column_text css=”.vc_custom_1663595743730{padding-right: 20px !important;padding-left: 10px !important;}”]Required Transport and Safety Equipment Legends:
You will need to get this item delivered A truck is required
Hirer will need to supply Traffic Control,
Suitable protective clothing is required
[/vc_column_text][vc_column_text][/vc_column_text][vc_column_text css=”.vc_custom_1663595758362{padding-right: 20px !important;padding-left: 10px !important;}”]Relevant Authority and Installation Requirements
Temporary Barriers, will they be selected, installed in accordance with the Manual of Uniform Traffic Control Devices (MUTCD) Part 3: Traffic control for works on roads November 2019 and Supplement:
[/vc_column_text][/vc_column][/vc_row]
Recent Comments